Pompe à vide et pointes filtrantes alignées vue rapprochée

Lowering the Water Table in Sandy Ground

Lowering the water table in sandy ground to build a wastewater treatment plant, the wellpoint technique was used

Context

Project Type :

Dewatering

Location :

Vézeronce-Curtin (38)
Logo entreprise Perriol TP Logo entreprise VAL TP

Problem

  • To construct a wastewater treatment plant, the customer requested that we lower the alluvial water table present at 2 m under the natural ground, with a height to lower of 2.40 m over an area of 1000 m². For the raising station, the water table had to be lowered by 3.40 m over an area of 400 m².

Solution

  • Installation of 3 water table lowering assemblies by wellpoints:
    • 1 for the feeder channel over a length of 100 m
    • 2 water table lowering assemblies terraced for building the structures of the wastewater treatment plant (aeration tank and clarifier)
  • 1 additional dewatering setup with boreholes of 10 m of 150 nominal diameter for the rasising station and the emptying equipment station
  • Complete pumping installation:
    • Power supplied by 2 generators 80 kVA one of which is back-up
    • 3 vacuum pumps of 7.5 kW
    • 200 m needle collector
    • 100 m leader line
    • 7 borehole pumps 4″
    • 1 decantation vat
  • Overall duration: 7 months
Pompe à vide et pointes filtrantes alignées
Pointes filtrantes avec une pompe à vide vue rapprochée
Double étage de pointes filtrantes avec un puisard et 2 pompes à vide
Double étage de pointes filtrantes avec un puisard