Bypassing Screen Rakes for a Wastewater Treatment Plant
Installation of a temporary pumping station to by-pass screen rakes for a wastewater treatment plant
Context
Project Type :
Pumping Solutions
Location :
Villeneuve d'Ascq (59)
Problem
- To allow fine and coarse screen rakes to be changed, the customer asked us to install a temporary pumping station to divert all the flows entering into the wastewater treatment plant.
Solution
- Complete installation of all the pumping equipment and electrical connection
- Pumped flow rate: 2700 m³/h not screened at 20 m TDH
- Additional emergency flow rate: 1 350 m³/h
- Equipment deployed for the pumping station:
- 3 electric 110 kW surface pumps
- 1 vacuum pump container + 1 workshop container
-
- 1 distribution cabinet 2500A + 3 speed regulator cabinets 110/160 kW
- 1 vacuum collector of Ø 800
- Information passed to the central PC of the WWTP
- 24h on-call service by our engineers + changing over every half day
- Duration: 7 days
![Pompes H12k et collecteur d'aspiration DN 800](https://www.dsl.fr/app/uploads/2020/10/by-pass-des-degrilleurs-dune-station-depuration-1.jpg)
![Passage de route pour canalisations](https://www.dsl.fr/app/uploads/2020/10/by-pass-des-degrilleurs-dune-station-depuration-2.jpg)
![Canalisations installées sur le toit de la STEP](https://www.dsl.fr/app/uploads/2020/10/by-pass-des-degrilleurs-dune-station-depuration-3.jpg)
![3 pompes de surfaces électriques H12K](https://www.dsl.fr/app/uploads/2020/10/by-pass-des-degrilleurs-dune-station-depuration-4.jpg)
![Installation de pompage](https://www.dsl.fr/app/uploads/2020/10/by-pass-des-degrilleurs-dune-station-depuration-5.jpg)
![Station d'épuration vu du ciel](https://www.dsl.fr/app/uploads/2020/10/by-pass-des-degrilleurs-dune-station-depuration-6.jpg)